S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
199. The authorization holder must regularly inspect joints and structural elements of every equipment used to control the pressure to ensure the safe operation of the equipment.
The holder keeps a register of those inspections and maintains it until the end of the work for the permanent closure of a well.
O.C. 1251-2018, s. 199.
In force: 2018-09-20
199. The authorization holder must regularly inspect joints and structural elements of every equipment used to control the pressure to ensure the safe operation of the equipment.
The holder keeps a register of those inspections and maintains it until the end of the work for the permanent closure of a well.
O.C. 1251-2018, s. 199.